AS683E Installation Procedures and Torques for Fluid Connections
Revised
10/28/2019
- Features
- Issuing Committee
- Content
- These procedures cover the following:
-
Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.
-
Section 4 - Boss end connections, positioned type, with back-up ring.
-
Section 5 - Boss end connections, positioned type, without back-up ring.
-
Section 6 - Boss end connections, non-positioned type.
-
Section 7 - Bulkhead connections.
-
- Pages
- 13
- Citation
- SAE International Technical Standard, Installation Procedures and Torques for Fluid Connections, SAE Standard AS683E, Revised October 2019, Reaffirmed May 2006, Issued April 1964, https://doi.org/10.4271/AS683E.