Urban Rapid Rail Vehicle and Systems Program Progress

750444

02/01/1975

Event
1975 Automotive Engineering Congress and Exposition
Authors Abstract
Content
This paper describes the content, objectives, and status of the U.S. Dept. of Transportation's Urban Mass Transportation Administration's Urban Rapid Rail Vehicle and Systems Program (URRVS). The URRVS Program includes the following separate but interrelated programs:
  1. 1.
    BART Monitor.
  2. 2.
    State-of-the-Art Cars (SOAC).
  3. 3.
    Advanced Concept Train (ACT-1).
  4. 4.
    Advanced Subsystems Development Program (ASDP).
  5. 5.
    Advanced Concept Train Future Planning (ACT-3).
Meta TagsDetails
DOI
https://doi.org/10.4271/750444
Pages
18
Citation
Hervey, D., "Urban Rapid Rail Vehicle and Systems Program Progress," SAE Technical Paper 750444, 1975, https://doi.org/10.4271/750444.
Additional Details
Publisher
Published
Feb 1, 1975
Product Code
750444
Content Type
Technical Paper
Language
English