THE SYSTEMS ENGINEERING THREAD: FROM CDD TO TRANSITION

2024-01-3520

11/15/2024

Features
Event
2024 NDIA Michigan Chapter Ground Vehicle Systems Engineering and Technology Symposium
Authors Abstract
Content
ABSTRACT

This presentation shows the process a team should use to initiate a design project based on the needs of the customer. The VRS project supports the future integration and development needs of four combat platforms (Abrams, AMPV, Bradley, and Stryker) and TARDEC’s PM CVP. For this presentation, and to simplify the explanation, the TRADOC developed capability for Silent Watch is used to demonstrate the processes of analyzing Capability Description Documents (CDD), creating and deriving good requirements, allocating them to specific functions and activities, describing those activities to the lowest level, designing, building, and eventually testing.

Meta TagsDetails
DOI
https://doi.org/10.4271/2024-01-3520
Pages
6
Citation
Ratajczak, G., and MacFadyen, K., "THE SYSTEMS ENGINEERING THREAD: FROM CDD TO TRANSITION," SAE Technical Paper 2024-01-3520, 2024, https://doi.org/10.4271/2024-01-3520.
Additional Details
Publisher
Published
Nov 15
Product Code
2024-01-3520
Content Type
Technical Paper
Language
English