Supplier development and capacitating for body shop lines' planning/designing by means of Digital Factory concepts

2010-36-0176

10/06/2010

Event
SAE Brasil 2010 Congress and Exhibit
Authors Abstract
Content
The pressure to reduce the life cycle of products, as a way to keep business maintenance and competitiveness of automotive companies, has stimulated the searching for solutions to shorten the long implementation timing of new manufacturing lines.
The use of Digital Factory concepts at Volkswagen of Brazil became itself an alternative for better assessment of products and process, thus shortening the installation period and reducing correction activities due to assertively found solutions.
The development of methodology and the structure of those concepts have established the necessity of expansion for companies which work in partnership on activities of planning and project designing of body shop lines. That work plan aims to feature the communication interfaces between suppliers and Volkswagen of Brazil, in order to define the basic tools that enable the information exchange and the qualification process of Suppliers according to patterns and requirements of the Digital Factory, already suited for concepts and structures of Volkswagen of Brazil, which are conducted by the Manufacturing Engineering - Body Shop.
Meta TagsDetails
DOI
https://doi.org/10.4271/2010-36-0176
Pages
9
Citation
Vidal, O., "Supplier development and capacitating for body shop lines' planning/designing by means of Digital Factory concepts," SAE Technical Paper 2010-36-0176, 2010, https://doi.org/10.4271/2010-36-0176.
Additional Details
Publisher
Published
Oct 6, 2010
Product Code
2010-36-0176
Content Type
Technical Paper
Language
English