The Stellantis North America Aero-Acoustic Wind Tunnel Upgrade

2026-01-0609

To be published on 04/07/2026

Authors
Abstract
Content
The Stellantis North America Aero-Acoustic Wind Tunnel (AAWT), which came into operation in June of 2002, has undergone the significant upgrade of installing a state-of-the-art moving ground plane system. A 5-belt Moving Ground Plane (MGP) has been installed. The center belt measures 8.5m long by 1.1m wide. The new balance is capable of testing all of the Stellantis North America’s vehicles, from small cars to large pickup trucks. Flow quality and other wind tunnel performance parameters were unchanged and remain at previously published specifications, which are on par with the latest industry standards. The new 5-belt rolling road system brings the AAWT to world class capability and it became operational in October 2024.
Meta Tags
Topics
Affiliated or Co-Author
Details
Citation
Lounsberry, Todd, Brent Ladouceur, and Gregory Fadler, "The Stellantis North America Aero-Acoustic Wind Tunnel Upgrade," SAE Technical Paper 2026-01-0609, 2026-, .
Additional Details
Publisher
Published
To be published on Apr 7, 2026
Product Code
2026-01-0609
Content Type
Technical Paper
Language
English