Space Station EVA Systems Trade-Off Model

860990

7/14/1986

Authors
Abstract
Content
A procedure has been developed to predict program costs for conducting extravehicular activity from Space Station. Space Transportation System EMU historical data has been used as a basis for performing the development and production phases. Complexity and risk factors are used to compare costs for various configuration options. Operations costs utilze ground, launch, and on-orbit penalty factors derived from operations analysis and EVA hardware configuration and performance data. Scar costs are based upon weight and flight or ground personnel overhead factors. The model compares nine separate configurations and extends from FY 1987 through the first ten years of Space Station operations. A spreadsheet format together with a grouping of the program constraints promotes rapid recalculations when new input data is desired.
Meta TagsDetails
DOI
https://doi.org/10.4271/860990
Pages
20
Citation
Carson, M., Price, L., and Jagow, B., "Space Station EVA Systems Trade-Off Model," SAE Technical Paper 860990, 1986, https://doi.org/10.4271/860990.
Additional Details
Publisher
Published
7/14/1986
Product Code
860990
Content Type
Technical Paper
Language
English