Risk Assessment of Bunkering Process for LNG River Powered Ship

2026-99-1722

5/22/2026

Authors
Abstract
Content
At present, with the rapid development of LNG powered ships, China’s LNG powered ships have formed a certain scale, but the speed of infrastructure construction such as bunkering stations restricts the development of LNG powered ships. In this process, “tank truck-to-ship bunkering”(TTS) has become one of the most widely used bunkering methods in China because of its flexible, fast and convenient characteristics, but there are many hidden dangers in the bunkering process. According to the characteristics of TTS, fault tree method is used to identify the risk of bunkering process, and the leakage of pipeline system is listed as the basic risk factor. The leakage probability of different aperture is analyzed by industry statistics. Three different leakage scenarios are selected and the consequences are simulated by PHAST software. The study shows that the failure of the valve and flange can easily lead to the leakage of LNG in the TTS process, and the leakage of the medium aperture and the full aperture will form the liquid pool, so some measures should be taken for the protection.
Meta TagsDetails
DOI
https://doi.org/10.4271/2026-99-1722
Citation
Dong, Y., "Risk Assessment of Bunkering Process for LNG River Powered Ship," 2025 2nd International Conference on Sustainable Development and Energy Resources (SDER 2025), Shenzhen, China, August 1, 2025, https://doi.org/10.4271/2026-99-1722.
Additional Details
Publisher
Published
13 hours ago
Product Code
2026-99-1722
Content Type
Technical Paper
Language
English