Load Indicating Systems in Lifting Crane Service - J-376a - A Case Study in the Revision of a Recommended Practice
750794
02/01/1975
- Event
- Content
- The need for clear definition of accuracy performance and operating criteria for Load Indicating Systems has been voiced by crane operators, crane manufacturers, and legislative agencies. A thorough study of the existing Recommended Practice was undertaken with the specific goal to upgrade J-376 to permit greater understanding of the minimum performance requirements of Load Indicating Systems.
- Pages
- 12
- Citation
- Parker, G., Elengo, J., Griffin, R., Schaner, D. et al., "Load Indicating Systems in Lifting Crane Service - J-376a - A Case Study in the Revision of a Recommended Practice," SAE Technical Paper 750794, 1975, https://doi.org/10.4271/750794.