Load Indicating Systems in Lifting Crane Service - J-376a - A Case Study in the Revision of a Recommended Practice

750794

02/01/1975

Authors Abstract
Content
The need for clear definition of accuracy performance and operating criteria for Load Indicating Systems has been voiced by crane operators, crane manufacturers, and legislative agencies. A thorough study of the existing Recommended Practice was undertaken with the specific goal to upgrade J-376 to permit greater understanding of the minimum performance requirements of Load Indicating Systems.