Load Indicating Systems in Lifting Crane Service - J-376a - A Case Study in the Revision of a Recommended Practice

750794

02/01/1975

Event
1975 SAE International Off-Highway and Powerplant Congress and Exposition
Authors Abstract
Content
The need for clear definition of accuracy performance and operating criteria for Load Indicating Systems has been voiced by crane operators, crane manufacturers, and legislative agencies. A thorough study of the existing Recommended Practice was undertaken with the specific goal to upgrade J-376 to permit greater understanding of the minimum performance requirements of Load Indicating Systems.
Meta TagsDetails
DOI
https://doi.org/10.4271/750794
Pages
12
Citation
Parker, G., Elengo, J., Griffin, R., Schaner, D. et al., "Load Indicating Systems in Lifting Crane Service - J-376a - A Case Study in the Revision of a Recommended Practice," SAE Technical Paper 750794, 1975, https://doi.org/10.4271/750794.
Additional Details
Publisher
Published
Feb 1, 1975
Product Code
750794
Content Type
Technical Paper
Language
English