Large Construction Site Design and Organization in Developing Countries
780533
02/01/1978
- Event
- Content
- Temporary facilities for construction projects become an important factor in the bidding stage of a large construction project and should be included in technological drawings and procedures later on.Guidelines for design selection and layout of the following temporary facilities categories are presented: field offices, field laboratory, lodging facilities, road and platforms, water-heating, electricity requirements, repair and maintenance field shops, plant site including temporary construction concepts, cost estimating criteria, planning on scheduling of temporary facilities requirements with the main project(s) schedule.
- Pages
- 14
- Citation
- Popescu, C., "Large Construction Site Design and Organization in Developing Countries," SAE Technical Paper 780533, 1978, https://doi.org/10.4271/780533.