International Space Station (ISS) United States (US) Laboratory Module Environmental Control and Life Support (ECLS) System Close-Out Process for Launch

2001-01-2388

07/09/2001

Event
31st International Conference On Environmental Systems
Authors Abstract
Content
The International Space Station (ISS) United States Laboratory module has been under test for approximately two years in the Space Station Processing Facility (SSPF) at NASA Kennedy Space Center (KSC) preparing for launch. Preparation activities for closing out the Environmental Control and Life Support (ECLS) system have included Closed Hatch testing to verify the capability of the life support equipment to support the crew, final manufacturing steps, and the close-out process itself. These activities were accomplished by an integrated Boeing and NASA team, located at the Johnson Space Center (Houston, Texas), Marshall Space Flight Center (Huntsville, Alabama) and Kennedy Space Center, Florida. On December 13, the Laboratory module hatches were sealed prior to loading into the Shuttle Orbiter payload bay for launch on February 7, 2001.
This paper will address the Laboratory module ECLS hardware configuration including off-gas testing, baseline cabin sampling used to compute initial on-orbit ingress contaminant load, final purge, and cabin pressure adjustment for launch.
Meta TagsDetails
DOI
https://doi.org/10.4271/2001-01-2388
Pages
11
Citation
Gentry, G., Reysa, R., and Wentz, G., "International Space Station (ISS) United States (US) Laboratory Module Environmental Control and Life Support (ECLS) System Close-Out Process for Launch," SAE Technical Paper 2001-01-2388, 2001, https://doi.org/10.4271/2001-01-2388.
Additional Details
Publisher
Published
Jul 9, 2001
Product Code
2001-01-2388
Content Type
Technical Paper
Language
English