Improvement 2001-01-3930 Assembly Line Improvement
2001-01-3930
03/05/2001
- Event
- Content
- This is a pilot project of Six Sigma at Master, which objectives the reduction of quality problems during the brakes assembly. The project reduced the internal level of defective product from 3680 PPM to 497 PPM, also was reduced the customer devolution from 1596 PPM in 1999 to
- Pages
- 7
- Citation
- Lovatto, M., and Kuver, E., "Improvement 2001-01-3930 Assembly Line Improvement," SAE Technical Paper 2001-01-3930, 2001, https://doi.org/10.4271/2001-01-3930.