Focusing on the requirements engineering activities, this study analyzed the problems in the implementation process of the forward design practice of commercial aircraft airframe, introduced the breakthrough methods, including the convergence and integration with the traditional design process, the supporting work organization model, process optimization, and specification, and proposed the airframe stakeholder need capture model based on the theory of systems engineering. Practice has shown that the requirements engineering implementation strategy introduced in this paper can effectively resolve conflicts and redundancies between the requirements system and the original top-level document system requirements. It ensures clear requirements sources, sufficient basis, reasonable allocation, controllable changes, adequate change assessments, clear design status, and controllable design risks. It effectively overcomes human resource bottlenecks during the early stage of requirements engineering implementation while cultivating talent reserves for systems engineering implementation, saving approximately 23.5 person-years in labor costs. It significantly optimizes non-value-added processes, reducing approximately 100 reports. It unifies the team’s understanding of requirements work, improves coordination efficiency, and significantly improves the requirements validation rate between aircraft-level and system-level requirements by an average of approximately 46%. It assists stakeholders and engineers in systematically and scientifically capturing product requirements during the design phase, with original product design specifications covering approximately 70% of subsystem specifications on average. Given its generality across the airframe forward design domain, the airframe requirement management paradigm established by this implementation strategy holds significant importance for the comprehensive and in-depth application of systems engineering methods in commercial aircraft development.