The Economics of Conventional P/M Parts Production in the U. S.

750410

2/1/1975

Authors
Abstract
Content
Enough of the manufacturing details for powder metallurgy, (P/M) are presented, for the reader to be able to outline the steps required to make a P/M part. The production rates, hourly equipment costs, and raw material costs are provided, so that the cost of a P/M part can be estimated. Tooling costs may be estimated by comparison with a graded series of examples. Some simplified or rule of thumb methods are also provided for estimating the costs of parts with given strength requirements.
Meta TagsDetails
DOI
https://doi.org/10.4271/750410
Citation
Pease, L., "The Economics of Conventional P/M Parts Production in the U. S.," 1975 Automotive Engineering Congress and Exposition, Detroit, Michigan, United States, February 24, 1975, https://doi.org/10.4271/750410.
Additional Details
Publisher
Published
2/1/1975
Product Code
750410
Content Type
Technical Paper
Language
English