Dynamic Scheduling for Aircraft Plating

910929

02/01/1991

Event
Airframe Finishing, Maintenance & Repair Conference & Exposition
Authors Abstract
Content
The metal finishing operations of electroplating, anodizing, etching, stripping and similar wet processes have historically been manual functions in the aircraft industry. This is true of both OEM and overhaul operations throughout the U.S. This paper will describe the increasing use of automation for these processes and how the invention and application of sophisticated computer control programs provide the means to achieve this automation. A special control algorithm that employs dynamic scheduling will be described. Case studies of aircraft finishing applications will be presented.
Meta TagsDetails
DOI
https://doi.org/10.4271/910929
Pages
10
Citation
Siniscalchi, S., Dascomb, W., and Arneson, G., "Dynamic Scheduling for Aircraft Plating," SAE Technical Paper 910929, 1991, https://doi.org/10.4271/910929.
Additional Details
Publisher
Published
Feb 1, 1991
Product Code
910929
Content Type
Technical Paper
Language
English