The Canadair CL-215 Water Bomber Program

670902

2/1/1967

Authors
Abstract
Content
This paper presents a survey of the development, design, and production phases of the CL-215 Water Bomber and the potential variants.
The development phase was concerned with optimizing the configuration through operations research studies, wind tunnel tests, hydrodynamic tank tests, and preliminary design activity.
During the design, certification, and production phase, close liaison between manufacturing and engineering is being maintained.
In conjunction with engineering, marketing has determined the need for a number of different variants of the CL-215, including a Search and Rescue and a Transport aircraft.
Meta Tags
Topics
Affiliated or Co-Author
Details
DOI
https://doi.org/10.4271/670902
Citation
Stapells, R., "The Canadair CL-215 Water Bomber Program," Aeronautic and Space Engineering and Manufacturing Meeting, Los Angeles, California, United States, October 2, 1967, https://doi.org/10.4271/670902.
Additional Details
Publisher
Published
2/1/1967
Product Code
670902
Content Type
Technical Paper
Language
English