Automation for the Assembly of the Bottom Wing Panels on Stringers for the A320
2006-01-3143
09/12/2006
- Event
- Content
- The paper details the two main phases of the research and development process which led to the current state on the stage 0 dedicated to the assembly of the A320 bottom panel on stringers and buttstraps.First phase: evaluation of the feasibility through trials on platform with a serial KUKA robot, evidence to achieve correctly 3/8" diameter and evidence of the difficulties to achieve the performances for the positioning accuracy.Second phase: development of specific solution on calibration and end effector, implementation on site, definitive performance proved during production.
- Pages
- 7
- Citation
- Cibiel, C., Redman, M., and Prat, P., "Automation for the Assembly of the Bottom Wing Panels on Stringers for the A320," SAE Technical Paper 2006-01-3143, 2006, https://doi.org/10.4271/2006-01-3143.