Application of EASA Part 21 Requirement Regarding Change to Aircraft Type Design by Airbus

2013-01-2124

09/17/2013

Event
SAE 2013 AeroTech Congress & Exhibition
Authors Abstract
Content
Airbus business and Extended Enterprise require more and more involvement of design and built suppliers, tier 1 but also across the complete supply chain i.e. tier 2-n. These suppliers are not working only for Aerospace industry and may have different cultures. The pressure on cost and overall efficiency is high and everybody has to cope with obsolescence and new regulation (e.g. REACH (Registration, Evaluation and Authorization and Restriction of Chemicals)). So it became very important for Airbus to clarify the criteria under which a change can be done without Airbus review, and criteria under which a change can be done without Airworthiness authority review.
This document details the Airbus recommendations and requirements to ensure full compliance with Part 21 to Airbus (and suppliers) with regards to:
  • Change to Aircraft Type Design
  • Change to Aircraft Type Design identification
  • Change to Aircraft Type Design identification assessment
This covers the complete scope of the detail design of the Aircraft. As the management of the Aircraft documentation is different depending of the domain, we have split the presentation in 3 sections:
  • Structure, System & Cabin installation
  • Equipment
  • Propulsion system.
Meta TagsDetails
DOI
https://doi.org/10.4271/2013-01-2124
Pages
5
Citation
Berger, V., "Application of EASA Part 21 Requirement Regarding Change to Aircraft Type Design by Airbus," SAE Technical Paper 2013-01-2124, 2013, https://doi.org/10.4271/2013-01-2124.
Additional Details
Publisher
Published
Sep 17, 2013
Product Code
2013-01-2124
Content Type
Technical Paper
Language
English