Agent Based Scheduling in Production System
2001-01-3225
10/01/2001
- Event
- Content
- The objective in a flexible manufacturing system is an optimal system resources scheduling. The production scheduling of such system may be resolved by a set of individual agents, which can work parallel and their coordination may bring a more effective way to find an optimal solution. Criteria for the optimal solution may be created on the time or economical (cost) basis but each may have a different priority depending on each situation. In this paper we will analyse an approach to find a feasible schedule of all products, which could minimize their costs and satisfy all constrains jointed with each product.
- Pages
- 8
- Citation
- Frankovic, B., Dang, T., and Moeller, K., "Agent Based Scheduling in Production System," SAE Technical Paper 2001-01-3225, 2001, https://doi.org/10.4271/2001-01-3225.