Agent Based Scheduling in Production System

2001-01-3225

10/01/2001

Event
Automotive and Transportation Technology Congress and Exposition
Authors Abstract
Content
The objective in a flexible manufacturing system is an optimal system resources scheduling. The production scheduling of such system may be resolved by a set of individual agents, which can work parallel and their coordination may bring a more effective way to find an optimal solution. Criteria for the optimal solution may be created on the time or economical (cost) basis but each may have a different priority depending on each situation. In this paper we will analyse an approach to find a feasible schedule of all products, which could minimize their costs and satisfy all constrains jointed with each product.
Meta TagsDetails
DOI
https://doi.org/10.4271/2001-01-3225
Pages
8
Citation
Frankovic, B., Dang, T., and Moeller, K., "Agent Based Scheduling in Production System," SAE Technical Paper 2001-01-3225, 2001, https://doi.org/10.4271/2001-01-3225.
Additional Details
Publisher
Published
Oct 1, 2001
Product Code
2001-01-3225
Content Type
Technical Paper
Language
English