A Forward Look at Gas Turbine Testing Facilities

801124

09/01/1980

Event
Aerospace Congress and Exposition
Authors Abstract
Content
High thrust-to-weight gas turbine engine development experience has shown that future testing facilities must be more complex and have increased capability. This paper defines the requirements for such facilities and the parameters that generate them. These test facilities include hardware, support services, and performance assurance capability required to meet future needs. Comparisons are made between military specification and currently perceived contractor testing requirements for gas turbine engines, rotating components, and accessories to meet future military procurement expectations, along with the influence of development instrumentation measurement uncertainty.
Meta TagsDetails
DOI
https://doi.org/10.4271/801124
Pages
12
Citation
Webb, W., "A Forward Look at Gas Turbine Testing Facilities," SAE Technical Paper 801124, 1980, https://doi.org/10.4271/801124.
Additional Details
Publisher
Published
Sep 1, 1980
Product Code
801124
Content Type
Technical Paper
Language
English