100,000 HP Gas Turbine Load Test Facility
760314
02/01/1976
- Event
- Content
- The problem of testing large gas turbines at full load in the factory has been solved with the construction of a load test facility utilizing a gas turbine compressor as the load absorption device. Design philosophy and features are reviewed, and a summary, of operating experience to date is presented.
- Pages
- 12
- Citation
- Allen, R., and Smith, T., "100,000 HP Gas Turbine Load Test Facility," SAE Technical Paper 760314, 1976, https://doi.org/10.4271/760314.