Simulation-Based Cost Model (SiCM), a discrete event simulation developed in Extend™, simulates pertinent aspects of the testing of rocket propulsion test articles for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.

Meta TagsDetails
Citation
"Software Estimates Costs of Testing Rocket Engines," Mobility Engineering, June 1, 2003.
Additional Details
Publisher
Published
6/1/2003
Product Code
TBMG-1040
Content Type
Magazine Article
Language
English