Drywall Finishing Robots Accelerate Construction Schedules

TBMG-53533

8/1/2025

Abstract
Content

San Francisco startup Canvas has developed a robotic system handling one of the most labor-intensive trades in construction: drywall finishing. Leveraging robotic arms from Universal Robots, Canvas has built a machine that reduces the usual five to seven days of spraying and sanding the drywall to just around two days for both Level 4 and Level 5 finishes.

Meta TagsDetails
Citation
"Drywall Finishing Robots Accelerate Construction Schedules," Mobility Engineering, August 1, 2025.
Additional Details
Publisher
Published
8/1/2025
Product Code
TBMG-53533
Content Type
Magazine Article
Language
English