Conversion From Tree to Graph Representation of Requirements

TBMG-5059

04/01/2009

Abstract
Content

A procedure and software to implement the procedure have been devised to enable conversion from a tree representation to a graph representation of the requirements governing the development and design of an engineering system. The need for this procedure and software and for other requirements-management tools arises as follows: In systems-engineering circles, it is well known that requirements-management capability improves the likelihood of success in the team-based development of complex systems involving multiple technological disciplines. It is especially desirable to be able to visualize (in order to identify and manage) requirements early in the system-design process, when errors can be corrected most easily and inexpensively.

Meta TagsDetails
Citation
"Conversion From Tree to Graph Representation of Requirements," Mobility Engineering, April 1, 2009.
Additional Details
Publisher
Published
Apr 1, 2009
Product Code
TBMG-5059
Content Type
Magazine Article
Language
English