Advanced RF Simulation Reduces Cost and Schedule Risk

TBMG-48715

8/1/2023

Abstract
Content

Designing the next generation of RF systems, such as high performance active electronically scanned arrays (AESA), requires contributions from a multidisciplinary team of engineers. Customers within the Department of Defense (DoD) require performance beyond the current state of the art in order to stay ahead of adversaries’ capabilities. As engineering teams work to meet these requirements, invariably, limitations in the available design, fabrication, and verification technologies consume the teams’ budget for design flexibility, performance, and novel solutions. Ultimately, this leads to concessions in the design and puts the overall project at risk for cost and schedule overruns.

Meta TagsDetails
Citation
"Advanced RF Simulation Reduces Cost and Schedule Risk," Mobility Engineering, August 1, 2023.
Additional Details
Publisher
Published
8/1/2023
Product Code
TBMG-48715
Content Type
Magazine Article
Language
English