This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Constructing Development Assurance Plan for Integrated Systems
- Aerospace Standard
- AIR6218
- Reaffirmed
Downloadable datasets available
Annotation ability available
Sector:
Issuing Committee:
Language:
English
Scope
This SAE Aerospace Information Report (AIR) supplements ARP4754A by identifying the crucial elements to be considered when constructing the development assurance plans described in Chapter 3 (Development Planning) of ARP4754A for integrated systems. This AIR presents a collection of lessons learned from past certification programs involving integrated systems. This AIR is not guidance for system integration technologies.
Rationale
This SAE Aerospace Information Report presents a collection of lessons learned for constructing development assurance plans for integrated systems based on past certification programs.
Recommended Content
Topic
Data Sets - Support Documents
Title | Description | Download |
---|---|---|
Unnamed Dataset 1 | ||
TABLE 1 | DEVELOPMENT PLANNING ELEMENTS |
Issuing Committee
S-18 Aircraft and Sys Dev and Safety Assessment Committee
The SAE S-18 Committee is active in the development of guidelines, including processes, methods and tools, to accomplish safety assessment of airplanes and related systems and equipment.
Reference
Number | Title |
---|---|
2007-01-3872 | Assuring a Complex Safety-Critical Systems of Systems |
ARP4754 | Certification Considerations for Highly-Integrated Or Complex Aircraft Systems |
Aircraftcertifi | This document is not part of the subscrption. |
* Redlines comparisons are available for those standards
listed in the Revision History that contain a radio button. A
redline comparison of the current version against a revision is
accomplished by selecting the radio button next to the standard and
then selecting 'compare'. At this time, Redline versions only exist
for some AMS standards. SAE will continue to add redline versioning
with ongoing updates to SAE MOBILUS.