The Value Engineering (VE) process. and therefore. the equation “Value = Function/Cost” is being used in the auto industry quite extensively. However. there are significant differences in the use of “tost” between the automobile industry and the more traditional users of the V.E. process: e.g.. defense. and construction. The tendency in the automobile industry has been to use a per unit variable cost. This approach, while giving adequate results for comparative purposes, is not technically correct. since the cost should include the total life cycle cost. Under some circumstances. this simplified approach could give erroneous results, for example, when incremental investment is a significant consideration in the decision-making process. This paper will suggest a method for establishing a total life cycle cost for use in the Value Engineering equation in Value Engineering an automotive component system.
Recommended Content
Technical Paper | Value Analysis at Work: A Case Study |
Technical Paper | How to Link Customer, Manufacturer, and Supplier Using “Value” as the Measure and VA/VE as the Method |
Authors
Citation
Milkie, G., "The Value Engineering Equation and the Auto Industry - A Definition of ‘Cost’," SAE Technical Paper 970767, 1997, https://doi.org/10.4271/970767.Also In
References
- Miles Lawrence D. Techniques of Value Analysis and Engineering Lawrence D. Miles Value Foundation Washington. D.C. 1989
- Mudge Arthur E. CVS Value Engineering A Systematic Approach J.Pohl Associates Pittsburgh. PA 1989
- Parker Donald E. Value Engineering Theory Lawrence D. Miles Value Foundation Washington, D.C. 1995