Phase III Integrated Water Recovery Testing at MSFC: International Space Station Configuration Test Results and Lessons Learned
Annotation ability available
Sector:
Language:
English
Abstract
A test has been completed at NASA's Marshall Space Flight Center (MSFC) to evaluate the latest Water Recovery and Management (WRM) system and Waste Management (WM) urinal design for the United States On-Orbit Segment (USOS) of the International Space Station (ISS) with higher fidelity hardware and integration than has been achieved in previous integrated tests. Potable and urine reclamation processors were integrated with waste water generation equipment and successfully operated for a total of 116 days to evaluate the impacts of changes made as a result of the redesign from Space Station Freedom (SSF) to the ISS. This testing marked the first occasion in which the WRM was automated at the system level, allowing for evaluation of the hardware performance under ISS operating conditions. It was also the first time a “flight-like” Process Control Water Quality Monitor (PCWQM) and a WM urinal were tested in an integrated system. Overall, the hardware showed no adverse effects in performance as a result of the redesign to the ISS configuration or system level automated control. This paper summarizes the test objectives, system design, test activities and protocols, significant results, anomalies and major lessons learned.
Authors
Citation
Holder, D., Carter, D., and Hutchens, C., "Phase III Integrated Water Recovery Testing at MSFC: International Space Station Configuration Test Results and Lessons Learned," SAE Technical Paper 951586, 1995, https://doi.org/10.4271/951586.Also In
References
- Bagdigian, R.M. Whitman G.A. “Phase III Integrated Testing at MSFC - Designs, Plans and Protocols” SAE # 891554 19th International Conference on Environmental Systems San Diego, CA July 1989
- “Protocol for the Participation of Human Research Subjects in the Environmental Control and Life Support System Phase III Test Program: Water Recovery Test Stages 1A, 2A, 3A, 1B, 2B, 3B and 6” Memorandum ED62 (40-90) Marshall Space Flight Center March 1990
- Bagdigian, R. M. Traweek M. S. Griffith G. K. Griffin M. R. “Phase III Integrated Water Recovery Testing at MSFC: Partially Closed Hygiene and Open Potable Loop Results and Lessons Learned” SAE # 911375 21st International Conference on Environmental Systems San Francisco, CA July 1991
- Bagdigian, R.M. Carter D.L. Holder D.W. McGriff C.F. Roman M.C. Traweek M.S. Williams W.R. “Space Station Freedom Environmental Control and Life Support System Phase III Water Recovery Test Stages 1A, 2A and 3A Final Report” January 1992
- Holder, D.H. Bagdigian R.M. “Phase III Integrated Water Recovery Testing at MSFC: Closed Hygiene and Potable Loop Test Results and Lessons Learned.” 22nd International Conference on Environmental Systems Seattle, WA July 1992
- Carter, D.L. Holder D.W. McGriff C.F. “Space Station Freedom Environmental Control and Life Support System Phase III Water Recovery Test Stage 7 Final Report” February 1993
- Carter, D.L. Holder D.W. McGriff C.F. “Space Station Freedom Environmental Control and Life Support System Phase III Water Recovery Test Stage 8 Final Report” February 1995
- “Water Recovery Test and Facility Design Requirements: Water Recovery Test Stage 9” Memorandum ED62 (05-94) MSFC January 1994
- Holder, D.W. Carter D.L. Hutchens C.F. “International Space Station Environmental Control and Life Support System Phase III Water Recovery Test Stage 9 Final Report” Test Report Marshall Space Flight Center
- “Environmental Control and Life Support System Architectural Control Document”
- “Analytical Quality Control Plan for the Water Recovery Systems Tests” Memorandum ED62 (65-90) MSFC June 1990
- Story, G.S. Williams W. Chiu C. “Space Station Freedom Environmental Database System (FEDS) for MSFC Testing,” SAE # 911379 21st International Conference on Environmental Systems San Francisco, CA July 1991
- Kindt, L.M. et. al. “Phase I Final Report for VRA Modeling Contract NAS8-38250-18”
- The Merck Index Budavari Susan et. al. 11th Merck & Co., Inc. Rahway, N.J. 1989