Cost and Schedule Implications of Multinational Coproduction

851150

06/01/1985

Event
Aerospace Vehicle Requirements Conference
Authors Abstract
Content
Assesses cost and schedule implications of acquiring weapon systems using multinational coproduction by examining experiences accumulated in a large and diverse set of aerospace development and production programs. Describes and, where possible, quantifies marked U.S. and European differences in such areas as production scale, workforce policies, schedule philosophy, and manufacturing approaches, and discusses the implications of these differences for the the success of collaborative programs. Examines in detail the effects of coproduction on the cost and schedule of the F- 16 fighter aircraft program.
Meta TagsDetails
DOI
https://doi.org/10.4271/851150
Pages
8
Citation
Rich, M., Stanley, W., and Birkler, J., "Cost and Schedule Implications of Multinational Coproduction," SAE Technical Paper 851150, 1985, https://doi.org/10.4271/851150.
Additional Details
Publisher
Published
Jun 1, 1985
Product Code
851150
Content Type
Technical Paper
Language
English