Capacity Planning and Productivity—A Tutorial
Annotation ability available
Sector:
Language:
English
Abstract
Factors which determine the throughput capacity of flow lines with varying operation times or availability are presented by simple examples. An extensive bibliography of analytic studies on flow line design is included.
Recommended Content
Authors
Citation
Wilson, R., "Capacity Planning and Productivity—A Tutorial," SAE Technical Paper 810109, 1981, https://doi.org/10.4271/810109.Also In
References
- Buxey G.M. Slack N.D. Ray Wild “Production Flow Line System Design: A Review,” AIIE Trans. 5 1 March 1973 37
- Ray Wild, Slack N.D. “The Operating Characteristics of ‘Single’ and ‘Double’ Non-mechanical Flow Line Systems,” Int. J. Prod. Res 11 2 April 1973 139 145
- Slack N.D. Ray Wild “Production Flow Line and Collective Working: A Comparison,” Int. J. Prod. Res. 13 4 July 1975 411
- Fazakerley G.M. “A Research Report on the Human Aspects of Group Technology and Cellular Manufacture,” Int. J. Prod. Res. 14 1 January 1976 123
- Warnecke H.J. Bullinger H.J. Metzger H. “Development Trends in Production Work Structuring,” Int. J. Prod. Res. 15 5 Sept. 1977 487
- Buxey G. “Incompletion Costs vs. Labour Efficiency on the Fixed-Item Moving Belt Flow Line,” Int. J. Prod. Res. 16 3 May 1978 233
- Hunt Gordon C. “Sequential Arrays of Waiting Lines,” Op. Res. 4 1956 674
- Barton K. “A Queueing Simulator for Determining Optimum Inventory Levels in a Sequential Process,” J. Ind. Engrg. 13 July 1962 245
- Friedman H. “Reduction Methods for Tandem Queueing Systems,” Op. Res. 13 1 January 1965 121
- Patterson R.L. “Markov Processes Occurring in the Theory of Traffic Flow Through an N-Stage Stochastic Service System,” Jour. Ind. Engrg. 15 4 July 1964 189
- Avi-Itzhak B. “A Sequence of Service Stations with Arbitrary Input and Regular Service Times,” Mgt. Sci. 11 5 March 1965 565
- Avi-Itzhak B. Yadin M. “A Sequence of Two Servers with No Intermediate Queue,” Mgt. Sci. 11 5 March 1965 553
- Grindlay A.A. “Tandem Queues with Dynamic Priorities,” Op. Res. Qtrly. 16 4 December 1965 439
- Giffin W.C. “A Simplified Model for Bulk Service at a Series of Stations,” J. Ind. Engrg. 17 8 August 1966 430
- Hillier F. Boling R.W. “The Effect of Design Factors on the Efficiency of Production Lines with Variable Operation Times,” J. Ind. Engrg. 17 12 December 1966 651
- Hillier F. Boling R.W. “Finite Queues in Series with Exponential or Erlang Service Times – A Numerical Approach,” Op. Res. 15 2 March 1967 286
- Hatcher J.M. “The Effect of Internal Storage on the Production Rate of a Series of Stages Having Exponential Service Times,” AIIE Trans. 1 2 June 1969 150
- Anderson D.R. Moodie C.L. “Optimal Buffer Storage Capacity in Production Line Systems,” Int. J. Prod. Res. 7 3 1969 233
- Knott A.D. “Letter on Hatcher's ‘Effect of Internal Storage…’” AIIE Trans. 2 3 September 1970 273
- Knott A.D. “The Inefficiency of a Series of Work Stations - A Simple Formula,” Int. J. Prod. Res. 8 2 1970 109
- Muth E.J. “The Production Rate of a Series of Work Stations with Variable Service Times,” Int. J. Prod. Res. 11 2 April 1973 155
- Kala R. Hitchings G.G. “The Effects of Performance Time Variance on a Balanced Four-Station Manual Assembly Line,” Int. J. Prod. Res. 11 4 October 1973 341
- Rao N.P. “On the Mean Production Rate of a Two-Stage Production System of the Tandem Type,” Int. J. Prod. Res. 13 2 March 1975 207
- McGee G.R. Webster D.B. “An Investigation of a Two-Stage Production Line with Normally Distributed Interarrival and Service Time Distributions,” Int. J. Prod. Res. 14 2 March 1976 251
- Rao N.P. “A Generalization of the ‘Bowl Phenomenon’ in Series Production Systems,” Int. J. Prod. Res. 14 4 July 1976 437
- Carnall C.A. Wild R. “Location of Variable Work Stations and the Performance of Production Flow Lines,” Int. J. Prod. Res. 14 6 November 1976 703
- Rao N.P. “Generalization of the ‘Bowl Phenomenon’,” Int. J. Prod. Res. 15 1 January 1977 117
- Smith L.D. Brumbaugh P. “Allocating Interstation Inventory Capacity in Unpaced Production Lines with Heteroscedastic Processing Times,” Int. J. Prod. Res. 15 2 March 1977 163
- Basu R.N. “The Interstate Buffer Storage Capacity of a Non-Powered Assembly Line. A Simple Mathematical Approach,” Int. J. Prod. Res. 15 4 July 1977 365
- Bdela Wyche Wild R. “The Design of Imbalanced Series Queue Flow Lines,” Op. Res. Qtrly. 28 3ii 1977 695
- Magazine M.J. Silver G.L. “Heuristics for Determining Output and Work Allocations in Series Flow Lines,” Int. J. Prod. Res. 16 3 May 1978 169
- Muth E.J. “The Reversibility Property of Production Lines,” Mgt. Sci. 25 2 February 1979 152
- Panwalker S.S. Smith M.L. “A Predicted Equation for Average Output of K Stage Series Systems with Finite Interstage Queen,” AIIE Trans. 11 2 June 1979 136
- Shimshak D.G. “A Comparison of Waiting Time Approximations in Series Queueing Systems,” N.R.L.Q. 26 3 September 1979 499
- Koenigsberg E. “Production Lines and Internal Storage – A Review,” Mgt. Sci. 5 January 1959 410 433
- Freeman M.C. “The Effect of Break-downs and Interstage Storage on Production Line Capacity,” Journ. I. E. 15 4 July 1964 194
- Buzacott J.A. “Automatic Transfer Lines with Buffer Stocks,” Int. J. Prod. Res. 5 3 1967 183
- Buzacott J.A. “Prediction of the Efficiency of Production Systems Without Internal Storage,” Int. J. Prod. Res. 6 3 1968 173
- Muth E.J. “A Method for Predicting System Downtime,” I. E. E. E. Trans. On Reliability, R-17 June 1968 97 102
- Boothroyd G. Redford A.H. “Mechanized Assembly,” McGraw-Hill London 1968
- Buzacott J.A. “Methods of Reliability Analysis of Production Systems Subject to Breakdowns,” N. A. T. O. Conf. On Reliability Turin 1969
- Muth E.J. “Excess Time, a Measure of System Reliability,” I. E. E. E. Trans. On Reliability, R-19 February 1970 16 19
- “An Application of Simulation to Compare Production Line Configurations with Failures and repairs,” Proc. Winter Simulation Conf. 1971 187
- Buzacott J.A. “The Role of Inventory Banks in Flow Line Production Systems,” Int. J. Prod. Res. 9 4 1971 425
- Buzacott J.A. “The Effect of Station Breakdowns and Random Processing Times on the Capacity of Flow Lines with In-Process Storage,” AIIE Trans. 4 4 December 1972 308
- Sevast'Yanow B.A. “Influence of Storage Bin Capacity on the Average Standstill Time of a Production Line,” Theory of Probability and Its Applications Silverman R.A. 7 1972 429 438
- Payne S. Slack N. Wild R. “A Note on the Operating Characteristics of ‘Balanced’ and ‘Unbalanced’ Production Lines,” Int. J. Prod. Res. 10 1 1972 93
- Kay E. “Buffer Stocks in Automatic Transfer Lines,” Int. J. Prod. Res. 10 2 1972 155
- Fox R.J. Zerbe D.R. “Some Practical System Availability Calculations,” AIIE Trans. 6 3 September 1974 288
- Gibra I.N. “Optimal Production of Processes Subject to Systematic Trends,” Int. J. Prod. Res. 12 4 1974 511
- Masso J. Smith M.L. “Interstate Storages for Three Stage Lines Subject to Stochastic Failure,” AIIE Trans. 6 4 December 1974 354
- Groover Mikel “Analyzing Automatic Transfer Machines,” I. E. 7 11 November 1975 26
- Rao N.P. “Two Stage Production Systems with Intermediate Storage,” A.I.I.E. Trans. 7:4 1975 414
- Law S.S. Baxter R.J. Massara G.S. “Analysis of In-Process Buffets for Multi-Input Manufacturing Systems,” J. Engrg. for Industry Trans. A.S.M.E. b 97 4 1975 1079
- Murphy R.A. “The Effect of Surge on System Availability,” A.I.I.E. Trans. 7 4 December 1975 439
- Sheskin T.J. “Allocation of Interstate Storage Along an Automatic Production Line,” AIIE Trans. 8 1 March 1976 146
- Hitomi Katsundo “Analysis of Production Models,” AIIE Trans. 8 1 March 1976 96
- Soyster A.L. Toof D.I. “Some Comparative and Design Aspects of Fixed Cycle Production Systems,” Nav. Res. Log. Qtrly. 23 3 September 1976 437
- Okamura K. Yamashina H. “Analysis of the Effect of Buffer Storage Capacity in Transfer Line Systems,” AIIE Trans. 9 2 June 1977 127
- Ignall E. Silver A. “The Output of a Two-Stage System with Unreliable Machines and Limited Storage,” AIIE Trans. 9 2 June 1977 183
- Muth E.J. “Numerical Methods Applicable to a Production Line with Stochastic Servers,” Algorithmic Methods in Probability Neuts M.F. TIMS Studies in the Mgt. Sciences 7 1977 143 159
- Murphy R.A. “Estimating the Output of a Series Production System,” AIEE Trans. 10 2 June 1978 139
- Okamure K. Yamashima H. “The Role of Buffer Storage Capacity in Balanced and Unbalanced Transfer Line Systems,” Annals of CIRP 27 1 1978 393
- Villa A. Rossetto S. “Transfer Line Efficiency as Affected by Stochastic Station Stoppages,” Proc. 6th NAMRC Conf. 1978 402
- Gershwin S.B. I. Schick C. “Analysis of Transfer Lines Consisting of Three Unreliable Stages and Finite Storage Buffers,” Report ESL-FR-834-9 Electronics Systems Laboratory, Mass. Inst. Tech. Cambridge, Mass. 1978
- Buzacott J.S. Hanifin L.E. “Models of Automatic Transfer Lines with Inventory Banks - A Review and Comparison,” AIIE Trans. 10 2 June 1978 197
- Smith D.R. Optimal Repair of a Series System,” O.R. 26 4 July 1978 653
- Wijngaard J. “The Effect of Interstage Buffer Storage on the Output of Two Unreliable Production Units in Series, with Different Production Rates,” AIIE Trans. 11 1 March 1979 42
- Soyster A.L. Schmidt J.W. Roher M.W. “Allocation of Buffer Capacities for a Class of Fixed Cycle Production Lines,” AIIE Trans. 11 2 June 1979 140
- Muth E.J. “Modeling and Estimation of the Availability of Serial Production Lines,” Res. Report 79-4 Dept. of Industrial and Systems Engrg., University of Florida Gainesville, Fla. 32611 October 1979
- Muth E.J. “Models for Production Lines in Which Stations are Subject to Breakdown,” Methods of Operations Res. 35 1979 345 346
- Ho Y.C. Eyler M.A. Chien T.T. “A Gradient Technique for General Buffer Storage Design in a Production Line,” Int. J. Prod. Res. 17 6 November 1979 557
- Okamura K. Yamashina H. “Justification for Installing Buffer Stocks in Unbalanced Two-Stage Automatic Transfer Lines,” A.I.I.E. Trans. 11 4 December 1979 308