This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Performance Development History-10 kw Turboalternator
Annotation ability available
Sector:
Language:
English
Abstract
The performance development history of a small gas turbine for the U. S. Army 10 kW turboalternator is discussed. The design incorporates a single-stage centrifugal compressor and single-stage radial inflow turbine, mounted back-to-back on a common shaft rotating at 93,500 rpm and directly coupled to a variable frequency solid alternator. Total accumulated running time, at rated speed during development, exceeded 20,000 h; in addition, a 2000 start/stop test was successfully completed. Gas turbine performance was found to be quite sensitive to compressor and turbine clearances as a consequence of the small compressor and turbine blade heights. With accurate control of these clearances, it was possible to attain average engine specific fuel consumptions meeting contract requirements of 1.1 lb/hp·h with a low rated turbine inlet temperature of 1330°F.
Recommended Content
Technical Paper | Experiences with Common Rail, a Technology Changing the Image of Diesels in Europe |
Technical Paper | Energy Converters for the PNGV Vehicle |
Authors
Citation
Rodgers, C., "Performance Development History-10 kw Turboalternator," SAE Technical Paper 740849, 1974, https://doi.org/10.4271/740849.Also In
References
- Rodgers l.C. “A Cycle Analysis Technique for Small Gas Turbines.” Institution of Mechanical Engineers Gas Turbine Symposium Warwick, Eng. April 9-11 1969
- Rodgers C. “Aerodynamic Development of a Radial Compressor for a 10 KW Turboalternator.”