Content
In this paper the Churchill Falls power development is briefly described. However, particular emphasis is placed on construction management and the types of heavy construction equipment required. The scope of each of the four major divisions into which construction at the project has been divided, i.e. storage, power, transmission and support facilities, is outlined. The basic performance data of the equipment used in each facility are listed.