Construction Simulation of the Main Earth Dam at Manicouagan 3
Annotation ability available
Sector:
Language:
English
Abstract
This paper describes the computer model developed to simulate construction of the eleven million cu yd gravel dam at Manic 3, and outlines the results obtained. Construction of the dam is a complex task influenced by many random events.
Manic 3 is part of Hydro-Quebec's Manicouagan-Outardes hydroelectric development, which will ultimately comprise seven power stations with a combined capacity of 5.5 million kW.
Before simulation was introduced, it was extremely difficult to solve the many problems involved in choosing and utilizing equipment, obtaining accurate time and cost estimates, and formulating realistic production schedules.
Authors
Citation
Godbout, S., Frenois, J., and Gravelle, A., "Construction Simulation of the Main Earth Dam at Manicouagan 3," SAE Technical Paper 700566, 1970, https://doi.org/10.4271/700566.Also In
References
- Gravelle A. G. “Rapport sur le programme des manutentions et transports a Outardes 4.” Report to Hydro-Quebec 1966
- Frénois J. P. Gravelle A. G. “Barrage de Manicouagan 3. Etude par simulation - Elevations 400 à 695” Final Report to Hydro-Quebec 1969
- Rooke W. “Hydro-Quebec simulates dam-building.” Heavy Construction News May 26 1969
- Frénois J. P. Gravelle A. G. “Construction simulation of the main earth dam at Manicouagan 3.” Canadian Operational Reserach Society
- Rosensthiel R. Ghouila-Houri A. “Decisions sequentielles et simulation.” Paris Dunod 1960
- Mize J. H. Cox J. G. “Essentials of simulation.” Englewood Cliffs, N. J. Prentice Hall 1968