This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Equipment Selection, Operation and Maintenance at Mangla Dam
Annotation ability available
Sector:
Language:
English
Abstract
The unprecedented size of the Mangla Dam Project has lead to the selection, operation, and maintenance of the largest peacetime construction fleet ever assembled. Equipment selection was carefully made, native operators trained and modern production techniques practiced. Resultant mechanical problems were resolved and routine repairs were accomplished by an energetic maintenance program, thus satisfactory results have been achieved by combining American construction industry know-how with good construction machinery and vendor service.
Recommended Content
Technical Paper | The Churchill Falls Power Development Its Management and Construction Equipment |
Technical Paper | Itaipu Hydroelectric Project |
Technical Paper | The James Bay Hydro-Electric Development |