Graphic PERT/Cost Milestone Reporting
620369
01/01/1962
- Event
- Content
- An uncomplicated, straightforward, and flexible system of associating costs with program milestones is presented. Costs are associated with milestones without expanding the basic PERT network, or requiring significant accounting structure changes. Computerized printouts reflect combined program cost and schedule status. The PERT cost milestone system permits predicting and reporting of cost and schedule status by end items of the contract.
- Pages
- 4
- Citation
- Swim, R., "Graphic PERT/Cost Milestone Reporting," SAE Technical Paper 620369, 1962, https://doi.org/10.4271/620369.