Study of a new Analysis Method of Risk Priority Number Based on FMEA

2015-01-0136

04/14/2015

Event
SAE 2015 World Congress & Exhibition
Authors Abstract
Content
In order to overcome the drawback that the traditional risk priority number method could not clearly make a risk priority sequence, a new analysis method of RPN was presented. Combined with loss costs, this method was based on FMEA. Several quantitative parameters such as servicing time and costs were introduced to replace the three parameters used in the traditional method. And it took loss costs caused by failure as the final risk priority number, instead of severity of effects, probability occurrence and difficulty detection. Finally, safety evaluation to work equipment and other critical systems of a forklift was processed as a case to illustrate this proposed method. The results showed that the results processed by the new method could be utilized to solve the problem that the RPN values couldn't be sorted.
Meta TagsDetails
DOI
https://doi.org/10.4271/2015-01-0136
Pages
5
Citation
Fan, Y., "Study of a new Analysis Method of Risk Priority Number Based on FMEA," SAE Technical Paper 2015-01-0136, 2015, https://doi.org/10.4271/2015-01-0136.
Additional Details
Publisher
Published
Apr 14, 2015
Product Code
2015-01-0136
Content Type
Technical Paper
Language
English