An Anecdote - Order of Magnitude Cost and Time Reduction in Delivering an Aircraft Manufacturing Solution

2013-01-2335

09/17/2013

Event
SAE 2013 AeroTech Congress & Exhibition
Authors Abstract
Content
From purchase order to production womb-to-tomb in 5 months to the day, Bombardier's Fuselage Assembly line was upgraded and made into a fuselage automated assembly pulse line. This was accomplished with a factory move of the assembly line while maintaining production of this legacy line without missing one aircraft. Early in 2012, a bold decision was made to change the plan from a manual process to an automated process and implemented on schedule. This was applying automation to a legacy aircraft assembly line. It worked. Both technology and recurring cost savings will be addressed in this paper.
Meta TagsDetails
DOI
https://doi.org/10.4271/2013-01-2335
Pages
5
Citation
Krofchak, L., and Mack, R., "An Anecdote - Order of Magnitude Cost and Time Reduction in Delivering an Aircraft Manufacturing Solution," SAE Technical Paper 2013-01-2335, 2013, https://doi.org/10.4271/2013-01-2335.
Additional Details
Publisher
Published
Sep 17, 2013
Product Code
2013-01-2335
Content Type
Technical Paper
Language
English