ECLSS Activities for Preparation of Columbus Stage 1.E

2008-01-2059

06/29/2008

Event
International Conference On Environmental Systems
Authors Abstract
Content
A significant effort has been conducted in 2007 by TAS-I (Thales Alenia Space Italia) to adequately prepare the Engineering Support to Mission 1E (Columbus installation) and subsequent stages for ECLSS operational support.
This activity has been conducted both in the frame of the Engineering Support Team (EST) responsibilities and in the frame of the Columbus/Payloads integrated Stage analyses.
Among the various tasks, two has been identified as outstanding:
  • The building of a Computional Fluid Dynamics (CFD) model of Columbus cabin for ventilation analyses.
  • The building of a tool for the calculation of cabin air volume flow rate from air loop telemetry data (primarily fans dp and input current)
This paper describes in detail the above mentioned activities by pointing the attention on the critical aspects to be faced and the utilized techniques, taking also into account 1E mission lessons learned, and future developments.
Meta TagsDetails
DOI
https://doi.org/10.4271/2008-01-2059
Pages
10
Citation
Parodi, P., Saluzzi, A., Audrito, G., Galletti, B. et al., "ECLSS Activities for Preparation of Columbus Stage 1.E," SAE Technical Paper 2008-01-2059, 2008, https://doi.org/10.4271/2008-01-2059.
Additional Details
Publisher
Published
Jun 29, 2008
Product Code
2008-01-2059
Content Type
Technical Paper
Language
English