We Start with “Lean Engineering” in the Design of New Drill/Install Fastener end Effector which then Leads us to “Lean Manufacturing” on the Factory Floor
2003-01-2944
09/08/2003
- Event
- Content
- The new DIF (Drill/Install Fastener) end effector machine series is being developed through implementing lean engineering. The end effectors will drill and install fasteners, eliminating many manufacturing process steps. Future enhancement capabilities are already designed in.
- Pages
- 4
- Citation
- Brown, M., Hubert, C., Mack, R., Van Gels, R. et al., "We Start with “Lean Engineering” in the Design of New Drill/Install Fastener end Effector which then Leads us to “Lean Manufacturing” on the Factory Floor," SAE Technical Paper 2003-01-2944, 2003, https://doi.org/10.4271/2003-01-2944.