Floor Drilling Gantry System

2002-01-2625

09/30/2002

Event
2002 SAE Automated Fastening Conference & Exhibition
Authors Abstract
Content
A new process for the drilling of floor panel fastener and fitting holes, plus the installation of fittings has been developed. The process integrates a Laser Tracker to check and align a floor grid assembly; a two spindle, CNC controlled, gantry drilling system to drill the floor grid assembly; a manual work area for the installation of the fittings and other manual work tasks; and a material handling system to move the floor grid assembly through the system. This system provides a cost reduction when compared to replacement cost of previously used equipment. It moves the drilling process out of the fuselage structure, reducing flow time and cleanup. This paper discusses the process requirements, design, and production results for this system.
Meta TagsDetails
DOI
https://doi.org/10.4271/2002-01-2625
Pages
10
Citation
Adams, E., DeLand, J., Gale, T., and Ryan, M., "Floor Drilling Gantry System," SAE Technical Paper 2002-01-2625, 2002, https://doi.org/10.4271/2002-01-2625.
Additional Details
Publisher
Published
Sep 30, 2002
Product Code
2002-01-2625
Content Type
Technical Paper
Language
English