Once-Up / One-Pass Drilling Process, C-17 Cargo Ramp Skin Assembly

1999-01-3426

10/06/1999

Event
Automated Fastening Conference & Exposition
Authors Abstract
Content
As an ongoing effort to achieve affordability goals and obtain additional aircraft orders, the C-17 program has developed and implemented a once-up / one-pass drilling process for the C-17 Cargo Ramp center skin to frame assembly operation. Traditionally, the aircraft assembly build process consists of the following steps: part assembly, multi-pass hole drilling, part disassembly, hole deburring, fay sealing, part re-assembly, and fastener installation. The once-up / one-pass drilling process reduces this sequence to: fay sealing, part assembly, one-pass hole drilling, and fastener installation. The new process will provide a significant recurring cost savings and cycle time reduction to the program by eliminating the labor and time-intensive efforts of disassembling, deburring, and re-assembling a skin panel 230 inches by 80 inches in size. This once-up / one-pass process has been achieved through a combination of assembly sequence changes, clamping method development, and drill motor / cutter system design.
Meta TagsDetails
DOI
https://doi.org/10.4271/1999-01-3426
Pages
8
Citation
Green, C., "Once-Up / One-Pass Drilling Process, C-17 Cargo Ramp Skin Assembly," SAE Technical Paper 1999-01-3426, 1999, https://doi.org/10.4271/1999-01-3426.
Additional Details
Publisher
Published
Oct 6, 1999
Product Code
1999-01-3426
Content Type
Technical Paper
Language
English