AS683E Installation Procedures and Torques for Fluid Connections

Revised

10/28/2019

Features
Issuing Committee
Scope
Content
These procedures cover the following:
  1. Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.
  2. Section 4 - Boss end connections, positioned type, with back-up ring.
  3. Section 5 - Boss end connections, positioned type, without back-up ring.
  4. Section 6 - Boss end connections, non-positioned type.
  5. Section 7 - Bulkhead connections.
Rationale
Content
Graphics redrawn to correct typo of view (d) in Figure 1. Graphics in Figures 2, 3, 4, and 5 enlarged to add clarity. Document ownership revised on last sheet of this document.
Meta TagsDetails
DOI
https://doi.org/10.4271/AS683E
Pages
13
Citation
SAE International Technical Standard, Installation Procedures and Torques for Fluid Connections, SAE Standard AS683E, Revised October 2019, Reaffirmed May 2006, Issued April 1964, https://doi.org/10.4271/AS683E.
Additional Details
Publisher
Published
Oct 28, 2019
Product Code
AS683E
Content Type
Technical Standard
Status
Revised
Language
English

Revisions