Your Selections

Baskaran, Vedantham
Show Only

Collections

File Formats

Content Types

Dates

Sectors

Topics

Authors

Publishers

Affiliations

Events

   This content is not included in your SAE MOBILUS subscription, or you are not logged in.

Implementation of Lean Approaches in Proto Body Build to Improve Productivity and Flexibility

B S Abdur Rahman University-Prince Arockia Doss Sebastian
Mahindra Research Valley-Ganesan Selvam, Surya Prakash Vaidhyanathan, Mohamed Zaheer Abdulla, Vedantham Baskaran
Published 2017-07-10 by SAE International in United States
Lean approaches are being implemented in various manufacturing facilities across the globe. The application of lean approaches are extended to Body proto build shop to maximize the efficiency of the shop with lesser floor space and optimized equipment. Weld fixture, Weld equipment and assembly tools are the major tools required essentially for proto BIW assembly. This paper explains how the Weld equipment planning was carried out with lean approaches and implemented effectively in proto body assembly shop. The implemented lean concepts are compared with Italy and Japanese proto body build makers to validate the frugal planning of the facility for the said intent. The implemented facility is capable of producing more than a model at a time. Weld parameter selection for weld gun, gun movement to the fixture with minimized change over time and movable weld gun gantry are the lean approaches implemented.
This content contains downloadable datasets
Annotation ability available