Starting Motor Pinions and Ring Gears
- Ground Vehicle Standard
- J543_198806
- Revised
Scope
Topic
Data Sets - Support Documents
Issuing Committee
The Electrical Systems Group is responsible for the maintenance project monitoring and forward planning of all standards projects and the timetables established for those projects by the Technical Committees in the areas of: Power Distribution, Power Systems, Powertrain/Chassis Electronics, Electrical/Electronic Reliability,Multiplexing and Diagnostics,Lighting and Signalling, Intra/Extravehicular Electromagnetic Compatibility as related principally to passenger cars or light trucks and defined by the Motor Vehicle Council.The Group is responsible for organizing or abolishing Technical Committees as needed to undertake and complete the preparation of SAE technical reports in their interest area. This responsibility includes coordination with other Systems Groups to eliminate areas of conflict and duplication and yet ensure that evolving needs are anticipated and met.The Group shall conduct an annual review of its Technical Committees to ensure that new technologies are being addressed within the existing Technical Committees. If no such committee exists, a new committee will be organized. The Group Director shall provide a status report to the Motor Vehicle Council.
Reference
Number | Title |
---|