This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Installation Procedures and Torques for Fluid Connections
- Aerospace Standard
- AS683C
- Reaffirmed
Sector:
Issuing Committee:
Language:
English
Scope
These procedures cover the following:
-
Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.
-
Paragraph 4 - Boss end connections, positioned type, with back-up ring.
-
Paragraph 5 - Boss end connections, positioned type, without back-up ring
-
Paragraph 6 - Boss end connections, non-positioned type.
-
Paragraph 7 - Bulkhead connections.
Rationale
This document has been reaffirmed to comply with the SAE 5-year Review policy.
Recommended Content
Aerospace Standard | PACKING, PREFORMED, O-RING MOLDED FROM PERFLUOROETHER, FFO MATERIAL |
Aerospace Standard | Minimum Standards for Valve, High Pressure Oxygen, Line Shut Off, Manually Operated |
Aerospace Standard | Oxygen System Maintenance Guide |
Topic
Data Sets - Support Documents
No Datasets Available
Issuing Committee
E-25 General Standards for Aerospace and Propulsion Systems
The SAE E-25 General Standards for Aerospace & Propulsion Systems committee addresses aerospace propulsion systems and components. These systems and components include bolts, screws, nuts, washers, studs, rivets, pins, covers, O-rings, brackets, plugs and associated procurement requirements, as well as solid film lubricants and design specifications for screw threads and fastener assembly requirements.
Reference
* Redlines comparisons are available for those standards
listed in the Revision History that contain a radio button. A
redline comparison of the current version against a revision is
accomplished by selecting the radio button next to the standard and
then selecting 'compare'. At this time, Redline versions only exist
for some AMS standards. SAE will continue to add redline versioning
with ongoing updates to SAE MOBILUS.