The successes of the long-duration MDA/NASA test programs for advanced life-support systems conducted prior to 1971 were highly dependent on the selection and training of both the test crews that remained inside the test chamber throughout the test periods and the outside operating staff. The operating staff was responsible for overall test performance, crew safety monitoring, operation and maintenance of the test facilities, and collection and maintenance of data. A selection, training, and certification program was developed and performed to ensure operating staff members had the correct technical skills and could work effectively together with the inside crew. A training program was designed to ensure that each selected operating staff member was capable of performing all assigned functions and was sufficiently cross-trained to serve at other positions on a contingency basis, if needed. The certification program consisted of a system of operational readiness reviews and pretest activities to verify the proficiency of the operating staff and their compatibility with the internal crew during normal, contingency, and emergency operations.
This paper describes the selection procedures, assignments, certification requirements, and training for the chamber test operating staff. Emphasis in this paper is on the MDA/NASA 90-day chamber test. Summary descriptions of the facilities, support equipment, and operating procedures used for the test are also provided.
Authors
Topic
Citation
Wells, G., Bonura, M., and Valinsky, J., "Operations and Staff Support for Chamber Testing of Advanced Life Support Systems," SAE Technical Paper 951487, 1995, https://doi.org/10.4271/951487.Also In
References
- Secord, T.C. Bonura, M.S. Operational Ninety-Day Manned Test of Regenerative Life-Support Systems SAE Paper 901257 July 1990
- MDAC Sixty-Day Manned Test of a Regenerative Life-Support System with Oxygen and Water Recovery, Part 1, Engineering Test Results NASA CR-98500 December 1968
- MDAC Operational Ninety-Day Manned Test of a Regenerative Life-Support System-Test Results NASA CR 111881 November 1970
- Seeman, J. S. Bonura, M. S. Crew Selection and Training for Chamber Testing of Advanced Life-Support Systems SAE Paper 951486 July 1995
- Bonura M.S. Manned Test Chamber Design Requirements MDC G2790 January 1972
- MDAC Operational Ninety-Day Manned Test of a Regenerative Life-Support System-Final Test Plan and Procedure NASA CR 111882 November 1970
- MDAC Space Station Simulator Facilities Operation Manual June 1970
- MDAC Life-Support System Operating and Checkout Manual August 1970
- King, R.E. ORIC Report for Operational Ninety-Day Manned Test of a Regenerative Life-Support System MDC G1037 July 1970