This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Space Shuttle Launch Pad Rescue Plan
Annotation ability available
Sector:
Language:
English
Abstract
The final preparation of the Space Shuttle Orbiter for flight involves the loading of large quantities of hazardous propellants. Additionally, many pyrotechnically operated mechanical joints are armed and ready for flight. The personnel manning at the pad is minimized during these operations to reduce the risk. Upon completition of propellant loading, the flight crew must be boarded onto the vehicle which at this point has tremendous potential energy. Plans have been made to safely and quickly evacuate the crew should some unforeseen contigency occur. Both aided and unaided egress scenarios have been planned. Personnel protective equipment is an important consideration to assure the highest chance for survival. Rapid movement of personnel is enhanced by the use of the slidewire system and specially prepared armored personnel carriers. The end result, as will be discussed in this paper, is a system that provides a reasonable chance of survival should an emergency occur during late countdown at the pad.
Recommended Content
Aerospace Standard | Human Factor Considerations for Outdoor Laser Operations in the Navigable Airspace |
Aerospace Standard | Aircraft Tire Wear Profile Development and Execution for Laboratory Testing |
Technical Paper | The Bombardier Flight Test Center - Meeting the Challenge |