Abstract
During 1987 three space station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.
Authors
- Richard G. Schunk - Environmental Control & Life Support Branch NASA/Marshall Space Flight Center, AL
- Robyn L. Carrasquillo - Environmental Control & Life Support Branch NASA/Marshall Space Flight Center, AL
- Kathyrn Y. Ogle - Environmental Control & Life Support Branch NASA/Marshall Space Flight Center, AL
- Paul O. Wieland - Environmental Control & Life Support Branch NASA/Marshall Space Flight Center, AL
- Robert M. Bagdiglan - Environmental Control & Life Support Branch NASA/Marshall Space Flight Center, AL
Citation
Schunk, R., Carrasquillo, R., Ogle, K., Wieland, P. et al., "CMIF ECLS System Test Findings," SAE Technical Paper 891552, 1989, https://doi.org/10.4271/891552.Also In
References
- Schunk Richard G. Humphries W.R. “Environmental Control and Life Support Testing at the Marshall Space Flight Center,” 17th Intersociety Conference on Environmental Systems July 1987
- Schunk R. Gregory Carrasquillo R.L. Ogle K.Y. Wieland P.O. Bagdigian R.M. “Space Station ECLSS Simplified Integrated Test Final Report,” NASA/MSFC March 1988
- Schunk R. Gregory Carrasquillo R.L. Ogle K.Y. Wieland P.O. Bagdigian R.M. “ECLS Extended Duration Metabolic Control Test Final Report,” NASA/MSFC December 1988
- Sauer R.L. Technical Briefing to the ECLSS Working Group (as presented by P. Furr) MSFC January 1989