This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Space Station Crew Workload: Station Operations and Customer Accommodations
Annotation ability available
Sector:
Language:
English
Abstract
The crew of the Space Station wiii divide their time between caring for the station systems and operating and maintaining payloads. Because of the relatively non-stressful flight regime, the long duration program life, and advances in automation and robotics they can devote more work time to payloads than in previous manned programs.
Recommended Content
Topic
Citation
Shinkle, G., "Space Station Crew Workload: Station Operations and Customer Accommodations," SAE Technical Paper 851803, 1985, https://doi.org/10.4271/851803.Also In
References
- Fischer, L. R. Armstrong, W. O. Warren, C. S. Mercury Project Summary Including Results of the 4th Manned Orbital Flight , NASA SP-45 October 1963
- Foster, N. G. Smistad, O. “Gemini Experiments Program Summary,” proceedings of the Gemini Summary Conference February 1-2 1967 Manned Spacecraft Center Houston, Texas
- Newkirk, R. W. Ertel, I. D. t Brooks, C. G. Skylab: A Chronology 1977
- Space Station Definition and Preliminary Design, Request for Proposal September 15 1984
- Space Station Mission Requirements Data Base NASA Langley Research Center March 1985
- Space Station Reference Configuration Description NASA Johnson Space Center August 1984