Abstract
Emergency standby generator systems require rapid start characteristics capable of providing on-line operation within 10 seconds under a wide range of environmental conditions. This paper describes the design and development of a fast start, air impingement system for a 200-kW, single-shaft, gas turbine generator set. The conventional electric start system was replaced by a high pressure, air start system which reduced the total start-to-load time from 21 to 9 seconds.
Recommended Content
Aerospace Standard | The Measurement of Engine Thrust in an Altitude Test Facility |
Technical Paper | High Speed Pumps for Gas Turbine Engines |
Aerospace Standard | Aircraft Fuel Weight Penalty Due to Air Conditioning |
Authors
Citation
Rodgers, C., "Fast Start System for a 200-KW Gas Turbine Generator Set," SAE Technical Paper 841568, 1984, https://doi.org/10.4271/841568.Also In
References
- Rodgers C. “Impingement Starting and Power Boosting of Small Gas Turbines,” ASME Paper 84-GT-188