This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Achieving Breakthrough on Manufacturing Floor through Project-Based Organization
Technical Paper
2009-36-0333
ISSN: 0148-7191, e-ISSN: 2688-3627
Annotation ability available
Sector:
Language:
English
Abstract
Many companies around the world have adopted the lean thinking as their strategy to operate, in a global market where changes happen all the time. One foundation for the success of lean manufacturing appliance is the continuous improvement approach which has been considered even on company statements, or it can be also considered as part of the genetic code of any enterprise. However, if in one side the continuous improvement thinking, set people mind to look for opportunities of improvement all the time, on other hand these improvements are incremental and they do not have significant impact on company performance on both short-term and medium-term and sometimes, the activities performed by the employees are not sustainable due to the lack of structure to manage and follow up these activities. Therefore, based on lean manufacturing concept, this paper has per its main purpose to discuss and make a proposal of an project-based manufacturing including the development of core competencies to reach breakthrough on critical areas of value stream that are strongly related with the company strategy and its performance, so this paper proposes an structure to focus company personnel on critical areas and provide tools to get significant and sustainable improvements with case study to support the proposals.
Topic
Citation
Júnior, J., "Achieving Breakthrough on Manufacturing Floor through Project-Based Organization," SAE Technical Paper 2009-36-0333, 2009, https://doi.org/10.4271/2009-36-0333.Also In
References
- CHASE, R.B. JACOBS, E.R. AQUILANO, N.J. Administração da produção para vantagem competitiva Trad. Brian Taylor 10ed Porto Alegre Bookman 2006
- FERRAZ, J.C. KUPFER, D. HAGUENAUER, L. Made in Brazil: desafios competitivos para a indústria Rio de Janeiro Ed. Campus 1995
- WOMACK, J.P. JONES, D.T. ROOS, D. The machine that changed the world New York Rawson Associates 1990
- HALL, R. Attaining manufacturing excellence New York McGraw-Hill 1987
- ARAUJO, C. A. C. Desenvolvimento e aplicação de um Método de Implementação de Sistemas de Produção Enxuta utilizando os processos de raciocínio da Teoria das Restrições e o Mapeamento do Fluxo de Valor Dissertação de mestrado Sao Carlos Escola de Engenharia de Sao Carlos — USP 2004
- VAN DER MERWE, A.P. Project management and business development: integrating strategy, structure, process and projects International Journal of Project Management 401 411 Elsevier Science 2002
- WOMACK, J.P. ROOS, D. Lean thinking: banish waste and create wealth in your corporation New York Free Press 1996
- MURMAN, E. et. al. Value in Aerospace Industry Palgrave New York 2002
- MEIRELLES, H. T. O processo de capacitação para produção enxuta: estudo de caso na Volvo Brasil Dissertação (Mestrado) — Departamento de Engenharia de Produção Universidade Federal de São Carlos São Carlos 2007
- ROTHER, M. SHOOK, J. Learning to see: value stream mapping to add value and eliminate waste Lean Enterprise Institute Massachusetts 1998
- MESQUITA, M. ALLIPRANDINI, D.H. Competências essenciais para melhoria contínua da produção: estudo de caso em empresas da indústria de autopeas Revista Gestão e Produção v. 100 n.1 17 33 2003
- BRUNET, A.P. NEW, S. Kaizen in Japan: an empirical study International Journal of Operations & Production Management v. 23 n.12 1426 1446 2003
- PANIAGO, A. L. Kaizen — implementação na indústria de autopeas. Resultado da redução das perdas na área produtiva Dissertação de mestrado, USP São Paulo 2008
- IMAI, M. Kaizen: a estratégia para o sucesso competitivo 3a. Ed. São Paulo IMAM 1992
- SEELIGER, J. AWALEGAONKAR, K. BELLOMO, G. So you want to get lean Kaizen or Kaikaku? www.oliverwyman.com
- GRYNA, F.M. CHUA, R.C.H. DEFEO, J.A. Juran's quality planning and analysis for enterprise quality 15th Ed New York Mc-Graw Hill 2006
- PMI A guide to the project management body of knowledge 3rd Ed Project Management Institute Newton Square 2004
- SEI Capability Maturity Model Integration for Systems Engineering, Software Engineering, and Integrated Product and Process Development (CMMI-SE/ SW/IPPD) v.1.1 SEI Carnegie Mellon 2001a